Civil Engineering
Gallery construction
BuM builds tunnel and gallery structures using these driving and construction methods:
- mechanical excavation
- drill and blast method
- New Austrian Tunneling Method (NATM)
- reinforced concrete inner lining using full-round formwork systems
Featured project
Building project:
Construction of a flood relief tunnel, 77815 Bühlot
Operations:
Excavator driving, shotcrete and rock bolting works, building of a reinforced concrete inner lining with a full-round formwork system